BORRADORES

EXTRU-PUR - Stage 1


Call: H2020-SMEInst-2018-2020-1
Project number: 855513
Type of action: Feasibility study (SME Phase 1) 
Duration: 6 months (Feb-Jul 2019)

During the SME Instrument Phase 1, our company has demonstrated the feasibility of the manufacturing technology and designed the roadmap for the next technologic developments. We have performed an approach to a disruptive reactive manufacturing technology (EXTRU-PUR) with the extrusion of a polyurethane bar: the simplest geometry for an extruded product. 

EXTRU-PUR - Stage 2

Call: LBDF Funding Program
Project number: P190-IND-01
Type of action: Proof of Principle study
Duration: 12 months (Jan-Dec 2019)


During the PoP study, our company has developed and certified our PUR windows through CE marking, scoring really high in the certification tests, especially in the thermal insulation performance. In addition, new biobased formulations have been developed to offer a new low C-Footprint & Highly Energy Efficient polyurethane window.

EXTRU-PUR - Stage 3


Call: NEOTEC 2019
Project number: SNEO-20191202
Type of action: Industrial Implementation
Duration: 12 months (Jan-Dec 2020)

During 2020, INDRESMAT is developing a simple but highly productive technology to manufacture polyurethane window frames and profiles with the aim to introduce the product into the market and get our first customers. The Neotec funding program will allow us to implement a pilot demo plant that will be fully automated and adapted to industry 4.0 during the 5th stage of our project: the European funding program EIC Accelerator.

EXTRU-PUR - Stage 4


Call: STARTUP CAPITAL 2019
Project number: STARTEC-19-0003
Type of action: Product-Market fit  
Duration: 18 months (Oct 2019-Sep 2021)
During 2020-2021, INDRESMAT will enter into the European market through a marketing campaign and a Kick Starter project to get the first end-users and supported by our customers (windows manufacturers) who will produce our PUR windows and deliver the product.   

SAFE-PUR - Stage 1


Call: H2020-SMEInst-2018-2020-1
Project number: 889258
Type of action: Feasibility study (SME Phase 1)
Duration: 6 months (Dec 2019 - May 2020)
During 2020, INDRESMAT has developed new formulations to be applied in several different products, for both rigid and flexible and other applications in order to determine the market potential of our highly safe insulating foams. 

MEER DOEN MET LIGNIN


Call: Operational Program South Netherlands
Type of action: R&D Collaborative Project
Project number: 02093-PROJ
Duration: 36 months (Feb 2019 - Feb 2022)
During 2020, INDRESMAT will be developing new formulations containing CLO and to be applied in several different products for both rigid and flexible and other applications in order to determine the market potential of our PUR products. 
Share by: